Resource Type

Journal Article 563

Conference Videos 38

Year

2024 1

2023 29

2022 50

2021 56

2020 25

2019 32

2018 20

2017 37

2016 16

2015 30

2014 20

2013 37

2012 28

2011 36

2010 39

2009 35

2008 19

2007 20

2006 7

2005 7

open ︾

Keywords

construction 28

ecological civilization 17

construction management 15

construction technology 10

system construction 10

Three Gorges Project 9

construction industry 7

sustainable development 7

construction project 5

project management 5

BIM 4

Sutong Bridge 4

Three Gorges Project ship lift 4

ecological civilization construction 4

green construction 4

ship lift 4

suspension bridge 4

tunnel construction 4

China 3

open ︾

Search scope:

排序: Display mode:

Schedule Compression Impact on Construction Project Safety

Curt Webb,Lu Gao,Ling-guang Song

Frontiers of Engineering Management 2015, Volume 2, Issue 4,   Pages 344-350 doi: 10.15302/J-FEM-2015059

Abstract: Many construction projects are met with stringent timelines or the threat of exorbitant liquidated damagesIn addition, construction schedulers are frequently forced to incorporate aggressive schedule compressionAs already discussed by previous researchers, these schedule compression techniques have direct impactscompression and safety in construction projects.We interviewed various members of the Houston construction community from both industrial and non-industrial

Keywords: construction safety     schedule compression     overtime     work shift     Hurdle model    

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 251-267 doi: 10.15302/J-FEM-2018086

Abstract: In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properlyAlthough several studies have been focused on the various effects of risk in construction projects, limitedefforts have been made to investigate the typical and the overall schedule delay risk.In this study, our aim is to detect the typical and overall schedule delay risk throughout the constructionproject lifecycle, which consists of the pre-construction, construction, and post-construction stages

Keywords: fuzzy analytic hierarchy process comprehensive evaluation     construction project     detection of delay risk    

System Simulation for Large-scale Bridge Construction Schedule Based on 4D CAD

Zhang Zhengfeng,Fu Jinqiang,Wu Kangxin,Zhang Fayu

Strategic Study of CAE 2006, Volume 8, Issue 1,   Pages 63-66

Abstract:

With the development of bridge construction, none of the traditional approaches, i. e. bar chart andnetwork diagrams, etc. , has the capabilities to match the development of construction management.schedule element.The dynamic visualization of construction process and intuitive analysis on the optimization of constructionAnd the corresponding software of visualization simulating system, based on 4D CAD, for construction

Keywords: construction schedule     system simulation     4D CAD     cable-stayed bridge    

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 97-102

Abstract: therefore, the internal and external environment and constraint condition are changed in the actual construction, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule

Keywords: long diversion tunnel     construction schedule     real-time control     visual     simulation    

GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Li Jingru,Zhong Denghua

Strategic Study of CAE 2005, Volume 7, Issue 8,   Pages 70-74

Abstract:

This paper presents a GIS-based visual simulation methodology for concrete dam construction processGVSS is a powerful schedule planning tool offering visualizing and querying capabilities simultaneouslyGVSS has been applied to a real concrete dam construction project, which verified the feasibility of

Keywords: visual simulation     GIS     concrete dam construction     schedule     optimization    

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 150-166 doi: 10.15302/J-FEM-2018012

Abstract: Getting the in the at the has always been a major organizational challenge. In ancient times this process seems to have been accomplished based on the scheme of arrangements being contained in the leader’s mind and instructions communicated verbally. Modern approaches to solving the twin challenges of first thinking through the ‘plan’ and then communicating the plan to the people who need to do ‘ ’ use sophisticated graphics, charts, diagrams, and computations. This paper traces the development of the concepts most project managers take for granted including bar charts and critical path schedules from their origins (which are far earlier than most people think) through to the modern day. The first section of the paper looks at the development of concepts that allow the visualization of time and other data. The second looks at the shift from static representations to dynamic modeling through the emergence of computers, dynamic calculations and integrated data from the 1950s to the present time.

Keywords: time management     scheduling     CPM     PERT     Gantt     Critical Path     bar chart    

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 20-27

Abstract:

The quality control and schedule control are the significant technicalproblems in high core rock-fill dam and high concrete dam construction.rock-fill dam and to control timely schedule of high concrete dam under high-intensity continuous constructionmethod of timely warning and dynamic adjustment of construction schedule is proposed to provide meansconstruction schedule.

Keywords: high core rock-fill dam     high concrete dam     construction quality     construction schedule     real-time monitoring    

Schedule refinement for homogeneousmulti-core processors in the presence of manufacturing-caused heterogeneity

Zhi-xiang CHEN,Zhao-lin LI,Shan CAO,Fang WANG,Jie ZHOU

Frontiers of Information Technology & Electronic Engineering 2015, Volume 16, Issue 12,   Pages 1018-1033 doi: 10.1631/FITEE.1500035

Abstract: according to the actual maximum clock frequencies at which cores can run, we present a heterogeneity-aware scheduleproposed scheme can improve the performance by an average value of 22.2%, compared with the baseline schedule

Keywords: Schedule refining     Multi-core processor     Heterogeneity     Representative chip operating point    

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 143-150

Abstract: risk events,a stochastic simulation evaluation method based on duration controllability of network scheduledistribution of project duration was simulated which was utilized to evaluate the rationality of the network schedule

Keywords: network schedule; stochastic simulation; risk reaction; duration controllability; evaluation    

Development of network schedule standardization system in hydraulic and hydropower engineering

Wang Renchao,Pan Feifei,Li Shiqi,Chen Jianyou

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 129-136

Abstract:

Network schedule is an important part in construction organization and design in hydraulic and hydropowerAs most network schedule software provided limited functionality in schedule generation and analysis,leading to network schedule generation is time-consuming, laborious, inefficient, and low degree ofstandardization, developed the standardization system of network schedule in hydraulic and hydropowerengineering, and introduced functions as network schedule aided generation, analysis, evaluation and

Keywords: hydraulic and hydropower engineering; network schedule; standardization; SHAPS    

Real-time Forecast of Irrigation

Mao Zhi,Li Yuanhua,Li Huichang

Strategic Study of CAE 2002, Volume 4, Issue 5,   Pages 24-33

Abstract:

The real-time forecast of irrigation is one of the essential part of the work for compiling a dynamic plan of irrigation water use. It plays an important role in saving water, increasing crop yields and economic benefits in an irrigation area. The real-time forecast of water requirements of crops is the essential and difficult part in the real-time foreast of irrigation. The methods and models for the conventional forecast of crop water requirement ,applied both in China and the world, are based on the application of the historic data from typical hydro-logic years. They can not used for the real-time forecast. In this paper, on the basis of the analyses of the relationship between the crop water requirements and the meteorological factors and non-meteorological factors such as the factors of plant and soil, the method and models for the real-time forecast of crop water requirements based on the factors of weather types, leaves cover percentage and effective soil moisture are presented and recommended. The concrete steps and computer block diagram are introduced. The main improvements are that the weather type is used instead of such four meteorological factors in Modified Peman's Eguation as air temperature, humidity, sunshine hour and wind speed,the leaves cover percentage is used instead of the leaves area index, and an improved equation for calculating soil moisture correction coefficient is proposed. Based on the results of the real-time forecast of crop water requirement and precipitation, the real-time measurement of soil moisture (for dry food crops fields) or depth of water layer (for paddy fields) and the maximum and minimum values of soil moisture content or water depth for getting high yields and saving water, and the calculation of field water balance, the method and models of real-time irrigation forecast including the real-time forecast of the date and quota of irrigation for both dry food crops fields and paddy fields are presented. In this paper, the precision of the real-time forecast and its effects on increasing yield and saving water are also introduced and discussed.

Keywords: irrigation     real-time forecast     evapotranspiration     irrigation schedule    

The Research and Application of Interval Numbers of Three Pa rameters

Hu Qizhou,Zhang Weihua, Yu Li

Strategic Study of CAE 2007, Volume 9, Issue 3,   Pages 47-51

Abstract:

To evaluate the cost risk and the schedule risk of the spaceflight project,  the schedule-cost (S-C) correlation coefficient is directly appointed according to the experts This paper deduces SDMCU (the schedule distribution model considering the effect of the cost uncertaintycoefficient based on the models of SDMCU and CDMSU (the cost distribution model considering the effect of the scheduleby means of mass numerical validation is the general rule of obtaining the estimation value of the schedule-cost

Keywords: spaceflight project     risk     cost     schedule     correlation coefficient    

Dynamic Setting Automatic Control System for Flatness and Gauge

Zhang Jinzhi,Duan Chunhua

Strategic Study of CAE 2000, Volume 2, Issue 6,   Pages 67-72

Abstract:

In this paper, the shape optimal rolling schedule and new method of shape and gauge coordination controlrolling circles is a misleading, so custom dispatch plan, making up roll crown and optimize rolling schedule

Keywords: dynamic load distribution     shape optimal schedule     dynamic programming     dynamic setting    

Applications of interdependent networks theory in the schedule management of warship level repairing

Qin Haibo,Jin Jiashan and Chen Yanqiao

Strategic Study of CAE 2015, Volume 17, Issue 5,   Pages 90-95

Abstract: This paper might provide methodological support for analyzing and finding weak links in the scheduleimproving work intensity of ship level repairing and ensuring the ship level repairing finished on schedule

Keywords: interdependent networks;ship;level repairing;program management    

Analyzing sustainability of construction equipment in the state of California

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI, Mohammad MOZAFFARPOUR

Frontiers of Engineering Management 2017, Volume 4, Issue 2,   Pages 138-145 doi: 10.15302/J-FEM-2017013

Abstract: Construction equipment encompasses highly polluting machines adversely affecting the environment.Management tools are necessary for sustainability assessment of construction equipment fleets to allowis a need for a metrics that will allow companies to accurately assess the sustainability of their constructionThis paper presents an evaluation of construction equipment fleets and data analysis.The metrics for construction equipment evaluation as well as the tool for sustainable decision-making

Keywords: Construction equipment     greenhouse gas emissions     sustainability index     sustainable construction    

Title Author Date Type Operation

Schedule Compression Impact on Construction Project Safety

Curt Webb,Lu Gao,Ling-guang Song

Journal Article

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Journal Article

System Simulation for Large-scale Bridge Construction Schedule Based on 4D CAD

Zhang Zhengfeng,Fu Jinqiang,Wu Kangxin,Zhang Fayu

Journal Article

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Journal Article

GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Li Jingru,Zhong Denghua

Journal Article

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

Journal Article

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Journal Article

Schedule refinement for homogeneousmulti-core processors in the presence of manufacturing-caused heterogeneity

Zhi-xiang CHEN,Zhao-lin LI,Shan CAO,Fang WANG,Jie ZHOU

Journal Article

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Journal Article

Development of network schedule standardization system in hydraulic and hydropower engineering

Wang Renchao,Pan Feifei,Li Shiqi,Chen Jianyou

Journal Article

Real-time Forecast of Irrigation

Mao Zhi,Li Yuanhua,Li Huichang

Journal Article

The Research and Application of Interval Numbers of Three Pa rameters

Hu Qizhou,Zhang Weihua, Yu Li

Journal Article

Dynamic Setting Automatic Control System for Flatness and Gauge

Zhang Jinzhi,Duan Chunhua

Journal Article

Applications of interdependent networks theory in the schedule management of warship level repairing

Qin Haibo,Jin Jiashan and Chen Yanqiao

Journal Article

Analyzing sustainability of construction equipment in the state of California

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI, Mohammad MOZAFFARPOUR

Journal Article